Project start: Project name: Project description:
   

 


December 2015

Execution Study Pipelines

A execution Study: Correlation Bowtie parameters pipelines < 1964 against Risk factors from Carola and Expert judgement.

September 2015

Risk Assessment Update Blending Stations

A Risk Assessment: ‘Update Blending Stations’ with the benefit of the software package of PIMS International B.V.

September 2015

Risk Assessment N2-Plant Ommen en N2-Plant Zuidbroek

A Risk Assessment: ‘N2-Plant Ommen en N2-Plant Zuidbroek’ with the benefit of the software package of PIMS International B.V.

April 2015

Risk Assessment Update GOS

A Risk Assessment: ‘Update GOS’ with the benefit of the software package of PIMS International B.V.

December 2014

Implementation Bowstar

Implementation Risk assessment tool of PIMS International B.V.

November 2014

Development BPI's (Pilot Pipelines)

To define the BPI's for the Gasunie pipeline network, with reference to the bowtie risk assessment methodology of PIMS International BV.

April 2014

In depth Risk Assessment all Pipelines

In depth bowtie analysis of all pipelines with the benefit of the software package of PIMS International B.V.

January 2014

Risk Register

Development and implementation Risk Register.

December 2013

Development KPI's for gas transmission operations


To define key performance indicators for the Gasunie pipeline network, with reference to the bowtie risk assessment methodology of PIMS International BV.

December 2013

T&M Expert

To integrate the bowtie model into the Threat and Mitigation module built by ATP, and through this, to be able to ultilize the bowtie model for managing data gathered from the Gasunie database.

April 2013

Update/Optimisation Risk Assessment HTL valves

Risk Assessment: Update/Optimisation existing bowtie analysis HTL valves including actuators and pressure control devices with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.

April 2013

Update/Optimisation Risk Assessment Compressor stations

Risk Assessment: Update/Optimisation existing bowtie analysis Compressor stations with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.

April 2013

Update/Optimisation Risk Assessment Export stations

Risk Assessment: Update/Optimisation existing bowtie analysis Export stations with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.


April 2013

Update/Optimisation Risk Assessment Blending stations

Risk assessment: Update/Optimisation existing bowtie analysis Blending stations with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.

April 2013

Update/Optimisation Risk Assessment all Pipelines

Risk Assessment: Update/Optimisation existing bowtie analysis pipelines with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.


April 2013

Update/Optimisation Risk Assessment Gas Delivery Stations

Risk assessment: Update/Optimisation existing bowtie analysis Gas Delivery Stations with the benefit of the software package of PIMS International B.V. based on the Residual Risk Indicators.

April 2013

Expansion current Comparison Bench Mark

Expansion current comparison bench mark between Gasunie, several Dutch pipeline operators and Sasol Gas

January 2013

Risk Assessment on Security   Management

Risk assessment: bowtie analysis on Security Management with the benefit of the software package of PIMS International B.V.

January 2013

Risk Standard Comparison

A risk standard comparison between Gasunie, several Dutch pipeline operators and Sasol Gas.

October 2012

Risk Assessment Gas Delivery   Stations

Risk assessment: Revision existing bowtie analysis Gas Delivery Stations with the benefit of the software package of PIMS International B.V.

October 2012

Risk Assessment HTL valves   including actuators and pressure control devices

Risk Assessment: bowtie analysis HTL valves including actuators and pressure control devices with the benefit of the software package of PIMS International B.V.

October 2012

Risk Assessment Compressor stations

Risk Assessment: bowtie analysis Compressor stations with the benefit of the software package of PIMS International B.V.

October 2012

Risk Assessment Export stations

Risk Assessment: bowtieanalysis Export stations with the benefit of the software package of PIMS International B.V.

October 2012

Risk Assessment Blending stations

Risk assessment: Revision existing bowtie analysis Blending stations with the benefit of the software package of PIMS International B.V.

April 2012

Risk Assessment all Pipelines

Risk Assessment: Revision existing bowtie analysis pipelines with the benefit of the software package of PIMS International B.V.

September 2011

In depth investigation   underground valves

The risk assessment of sub-surface valves of Gasunie has been completed mid 2011 and the conclusions and recommendations of the policy document that has been made by PIMS International have been adopted. Gasunie has decided to execute an in depth investigation to identify the most appropriate mitigating measure for each make / type of the sub-surface valves beiing in service in the Gasunie RTL grid. This in depth investigation project has been awarded to PIMS International and will be executed in close cooperation with an expert team of Gasunie.

May 2011

Risk Assessment of Blending   stations

Risk assessment of Blending Stations to support the development of new company policy on Asset Integrity Management on the basis of RBI-approach for this particular asset type.

February 2011

Risk Assessment Gas delivery   stations

Risk assessment of Gas Delivery Stations to develop new company policy on replacement / maintenance of sub-surface valves.

January 2011

Operationalization NTA-8000

A methodology required for Gasunie to meet NTA 8000 requirements (and to meet the requirements of the BEVB, the new Dutch law on the management of external risk of high pressure gas/oil pipelines) has been developed, in an earlier stage of the project,  by experts of PIMS International. The current project involves the operationalisation of the methodology developed including the execution of risk assessment which are required to demonstrate full transparency of risk management practice in Gasunie's pipeline Operations.

November 2010

Development Policy Underground Valves

Risk assessment of sub-surface valves to develop new company policy on replacement / maintenance of sub-surface valves.

November 2010

Development PIMS in Space   Model

PIMS International has acquired a project funded by the ESA Integrated Applications Programme that focuses on monitoring gas and oil pipelines using space-borne sensors. End users (Gasunie, The Netherlands, and SASOL Mozambique and South Africa) are involved throughout the project in the definition of the requirements and testing of the system. The PIMS in Space project is carried out in a Dutch consortium with EuroP!MS (Groningen) and Ursa Minor (Delft) and led by S[&]T as prime contractor.